1,500 sq foot home, upstairs and downstairs. Once a month cleaning requested.
Have a small backyard with weeds, grass patch about 10ft by 25ft rest is concrete. Needs pulling and some maintenance as well as basic organization and pick up.
Deep clean for house, approx 1500 sq foot. 3 bed 1 bath, most of work on 1st floor small amounts of work on 2nd floor.
I already have the siding. I do not have anything else like the jmolding, nails, etc. I only have the siding.
Need help cleaning the yard of leaves, front yard and backyard. About 2,000 sq feet and some general lawn maintenance. Open to long term work
Patch a hole in the wall for a towel rack to screw into
Grout in bathroom has eroded, need to have tile replaced and regrouted to prevent mold.
๐ Project Description: We are delighted to propose our professional staining services for your existing 20x20 rough cedar pergola. This project will enhance the beauty and durability of your pergola by applying a high-quality stain to the cedar posts and slats, ensuring a refreshed look that integrates seamlessly with your homeโs exterior. ๐จ Scope of Work: 1. Site Inspection: Conduct a thorough inspection of the pergola to assess the condition of the wood and identify any specific treatment needs. 2. Surface Preparation: Clean the cedar wood to remove dirt using a broom. 3. Stain Application: Apply a premium exterior wood stain using airless sprayer to all cedar components of the pergola, ensuring even coverage and protection. 4. Cleanup: Remove all masking materials, coverings, and clean the work area thoroughly. 5. Final Inspection: Conduct a walkthrough with you to ensure complete satisfaction with the staining job. ๐ Deliverables: - Professional staining of the rough cedar pergola - All necessary materials and equipment for the project - Complete cleanup of the project area upon completion โ ๏ธ Notes: - Weather conditions in Denver may affect scheduling; we will communicate any changes promptly. - Access to the pergola must be clear during scheduled work hours. All neighbors objects such as cars or furniture need to be moved. - This proposal excludes any structural repairs or modifications to the pergola. By entrusting us with your pergola staining project, you can expect meticulous attention to detail and a commitment to quality that enhances the beauty and longevity of your outdoor space. ๐ง Step-by-Step Cost Breakdown Step 1: Site Inspection - Materials: None required - Labor: 1 hours @ $100/hr = $100 - Step Total: $100 Step 2: Surface Preparation - Materials: Wood cleaner ($25), Drop cloths ($50) = $75 - Labor: 2 hours @ $100/hr = $200 - Step Total: $300 Step 3: Cover area and Stain Application - Materials: Exterior wood stain (5 gallons @ $45/gallon) = $225, Airless Sprayer = $120, mineral spirits $25. - Labor: 8 hours @ $100/hr = $800 - Step Total: $1170 Step 4: Cleanup - Materials: Garbage bags (2 boxes @ $5/box) = $10, Cleaning cloths (1 pack @ $15/pack) = $15 - Labor: 2 hours @ $100/hr = $200 - Step Total: $225 Step 5: Final Inspection - Materials: None required - Labor: 1 hour @ $100/hr = $100 - Step Total: $100 ------------------------------------ ๐งพ Summary Total Labor Hours: 12-16 Total Material Cost: $470 Estimated Total Cost (with markup): $2,160 Estimated Duration: 1-2 days
1. Remove existing tile flooring in the kitchen. 2. Inspect the subfloor for any damage or unevenness. 3. Repair or replace any damaged or uneven areas of the subfloor. 4. Acclimate the hardwood flooring to the room for at least 48 hours. 5. Install a moisture barrier or underlayment as needed. 6. Begin laying the hardwood flooring, starting from the center of the room. 7. Cut and fit the hardwood planks around obstacles such as cabinets and appliances. 8. Nail or glue down the hardwood flooring according to manufacturer's instructions. 9. Install any transition strips or moldings where the hardwood meets other types of flooring. 10. Sand and finish the hardwood flooring to achieve the desired look. 11. Clean up and dispose of any debris from the installation process. 12. Inspect the finished hardwood flooring for any defects or issues. 13. Provide maintenance and care instructions to the homeowner.
Finish basement with bedroom and full bathroom. Drywall ceilings only in bedroom and bathroom
Finish drywalling bathroom, install toilet, bathroom vanity, mirror, light fixtures, install shower with basin and tile shower walls, install Coretec flooring, complete electrical for lighting, move plumbing drainage, install plumbing. Client to purchase fixtures and materials for flooring, tiling, toilet, shower, and vanity. Contractor to purchase drywall and other needed installation resources. Contractor to paint walls, client to supply paint.